Coldwater Creek Emergency Repair

St. Louis, Missouri

City of St. Louis

Services:

  • Earthwork
  • Box Culvert
  • Concrete Paving

Project Details

In 2018, Millstone Weber (MW) was contracted to perform an emergency repair to eliminate a blockage of Coldwater Creek caused by a collapsed corrugated metal pipe. While the excavation and demolition were underway, MW collaborated with the engineer to upgrade the existing facilities impacted during the demolition phase. Upgrades included the installation of a double 12’ X 12’ precast box culvert, drainage improvements, a larger glycol pump station, new sanitary line, and new concrete pavement.