Harry S. Truman Road Reconstruction Phase 1 & 2

St. Charles, MO

Services Performed

Pavement Removals, Earthwork, Drainage Installation, Concrete Flatwork

Project Owner

City of St. Charles

Project Overview

This $5.6 million, 1 mile long 5 lane project consists of full depth pavement reconstruction.  The project was built in two Phases, broke into two stages per Phase.  The project consists of full depth pavement removal, 23,000 CY of earthwork, 52,000 SY of rock base, 22,000 tons of asphalt” k, 5’ concrete sidewalk and 10’ concrete path the full length of the improvement along with installation of 57 new drainage structures and 3800 LF of drainage pipe. 

 

MW performed the pavement removals, earthwork, placing of rock base, installation of drainage structures and pipe, constructed concrete barrier wall, and poured misc concrete flatwork that included approaches, curb, gutter, 5’ sidewalk and 10’ sidewalk.